Default house next door construction problems ? to complain

next door floored old house and re-building new big house. Now bang, drilled, pound like building new mrt station for 3+2 years already.

noise no choice, they have broken my main water pipe losing abt 20L/minute according to PUB, finally repaired with a lot of reluctance and time wasting.
Now they drilling 20ft below ground holes and 4.5 storeys high, building basement from front to back , etc and my whole house shaking like earthquake every day.

Recently cement floor cracking and god knows what lie beneath also broken.
Called BCA engineer (who came and confirmed damages and warnings given many x), called URA ( who put my call on record)

nobody seems to want to help, called the site in charge (doesn't seem keen to hear anything, even send pictures of damage floors) and BCA engineer always cannot get via telephone.

anyone can help to advise on what to do?
thanks.
wllm33 is offline   Reply With Quote
Old 22-11-2017, 10:49 PM   #2
yoAro
Dragon
 
Join Date: Feb 2009
Posts: 2,458
Default

Find MP lor.
yoAro is offline   Reply With Quote
Old 22-11-2017, 11:02 PM   #3
Guppies Onli
Dragon
 
Guppies Onli's Avatar
 
Join Date: Sep 2003
Posts: 1,457
Default

For property guess onli lawyer is best.
Guppies Onli is offline   Reply With Quote
Old 22-11-2017, 11:05 PM   #4
loveikan
Arofanatic
 
loveikan's Avatar
 
Join Date: Jun 2006
Posts: 384
Default

Quote:
Originally Posted by Guppies Onli View Post
For property guess onli lawyer is best.
Yea. Get a court order first and they sure come to look for you. kwai kwai sit down to talk to you.
loveikan is offline   Reply With Quote
Old 22-11-2017, 11:23 PM   #5
stargazer
Dragon
 
stargazer's Avatar
 
Join Date: Sep 2011
Posts: 877
Default

3 over yrs building a single house is a long time
stargazer is offline   Reply With Quote
Old 23-11-2017, 12:41 AM   #6
hkh
Arofanatic
 
hkh's Avatar
 
Join Date: Jun 2003
Posts: 113
Default

Quote:
Originally Posted by stargazer View Post
3 over yrs building a single house is a long time
Can tahan for 3 years is also not easy.........
hkh is offline   Reply With Quote
Old 23-11-2017, 04:00 AM   #7
KeeHuat
Dragon
 
KeeHuat's Avatar
 
Join Date: Dec 2007
Posts: 1,357
Default

4.5 storeys high and taking 3 years to build, must be condo or apartments. Normal house at most 3 storeys plus basement and should be completed in 1 year.
KeeHuat is offline   Reply With Quote
Old 23-11-2017, 05:19 AM   #8
tangmulong4488
Dragon
 
tangmulong4488's Avatar
 
Join Date: Dec 2005
Posts: 1,653
Default

Omg such nightmare.
tangmulong4488 is offline   Reply With Quote
Old 23-11-2017, 07:35 AM   #9
millenium
Senior Dragon
 
millenium's Avatar
 
Join Date: Mar 2002
Posts: 3,495
Default

Sue them. Start by sending them a lawyer letter. Gather all the evidence, but dun need to show them first.
millenium is offline   Reply With Quote
Old 23-11-2017, 07:42 AM   #10
richardg
Arofanatic
 
richardg's Avatar
 
Join Date: Oct 2005
Posts: 120
Default

Quote:
Originally Posted by wllm33 View Post
next door floored old house and re-building new big house. Now bang, drilled, pound like building new mrt station for 3+2 years already.

noise no choice, they have broken my main water pipe losing abt 20L/minute according to PUB, finally repaired with a lot of reluctance and time wasting.
Now they drilling 20ft below ground holes and 4.5 storeys high, building basement from front to back , etc and my whole house shaking like earthquake every day.

Recently cement floor cracking and god knows what lie beneath also broken.
Called BCA engineer (who came and confirmed damages and warnings given many x), called URA ( who put my call on record)

nobody seems to want to help, called the site in charge (doesn't seem keen to hear anything, even send pictures of damage floors) and BCA engineer always cannot get via telephone.

anyone can help to advise on what to do?
thanks.
they shld have done survey on your property before commencing works?
Best is find MP. MP will forward to BCA.
Email MP with photos of defects.
Any defects or leaks, take photos or videos.
BCA is most helpful as main con needs BCA to approve stuff like TOP.
Talk to main con project manager.

There some some requlations to when they can work.
Think till 10.30pm or something, ask MP, BCA
and no work on Sundays.
If they do, call NEA.
Or any mosquito call NEA.
richardg is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +9. The time now is 10:44 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Copyright © 2000-2008 Arofanatics.com (Since 30th August 2000)